Civil Works

Civil works completed as a main contractor

Road works

S.
No.
NAME Length Width TYPE COST Status
1 COMPLETION OF ACCESS ROADS
and CIVIL WORKS at VIHIGA DIST.
HOSPITAL, MBALE
1.0 KM 6.0 M Bitumen
surfaced
20.00 M Comp. - 2005
(These are Bitumen Surfaced Roads with Murram and
Hand Packed Stones Complete with all Civil Works)
2 TINDERET ACCESS ROAD Tinderet Tea Estate 2.5 KM 6.4 M MURRAM
ROAD
10.0 M Comp. - 2004
3 LESSOS HILL TOP (Supervision Only) 2.2 KM 5.9 M MURRAM
ROAD
6.0 M Comp. - 2004
4 BIBIRIONI ACCESS ROAD Bibirioni 0.5 KM 4.0 M MURRAM
ROAD
1.5 M Comp. - 2004
5 FEMINIST REPUBLIK H. FARM
ACCESS ROAD Muselele, Yatta, Kitui County
3 KM 5.5 M MURRAM
ROAD
13.0 M Comp. - 2024
S. No. 1
ROAD PROJECT
COMPLETION OF ACCESS ROADS and CIVIL WORKS at VIHIGA DIST. HOSPITAL, MBALE
Length
1.0 KM
Width
6.0 M
Type
Bitumen surfaced
Cost
20.00 M
Status
Comp. - 2005
(These are Bitumen Surfaced Roads with Murram and Hand Packed Stones Complete with all Civil Works)
S. No. 2
ROAD PROJECT
TINDERET ACCESS ROAD Tinderet Tea Estate
Length
2.5 KM
Width
6.4 M
Type
MURRAM ROAD
Cost
10.0 M
Status
Comp. - 2004
S. No. 3
ROAD PROJECT
LESSOS HILL TOP (Supervision Only)
Length
2.2 KM
Width
5.9 M
Type
MURRAM ROAD
Cost
6.0 M
Status
Comp. - 2004
S. No. 4
ROAD PROJECT
BIBIRIONI ACCESS ROAD Bibirioni
Length
0.5 KM
Width
4.0 M
Type
MURRAM ROAD
Cost
1.5 M
Status
Comp. - 2004
S. No. 5
ROAD PROJECT
FEMINIST REPUBLIK H. FARM ACCESS ROAD Muselele, Yatta, Kitui County
Length
3 KM
Width
5.5 M
Type
MURRAM ROAD
Cost
13.0 M
Status
Comp. - 2024

Civil Works

S.
No.
NAME TYPE COST Status
1 KIBABII TEACHERS'
TRAINING COLLEGE
Paved Road, Septic Tank, Pumping
Sewer System for 10 KM Length,
Storm Water Drainage, Water
Reticulation etc.
160.00 M Completed -
2010
2 SIGOWET Sub-Dist.
Hospital
Paved Road, Septic Tank, Sewer
System, Storm Water Drainage,
Water Reticulation etc.
26.00 M Completed -
2009
3 KAPKATET Sub-Dist.
Hospital
Paved Road, Septic Tank, Sewer
System, Storm Water Drainage,
Water Reticulation etc.
18.00 M Completed -
2009
4 THE SALVATION ARMY
Headquarters
Paved Road, Septic Tank, Sewer
System, Storm Water Drainage,
Water Reticulation etc.
32.00 M Completed -
2008
5 CENTRAL POLICE
LINES
Paved Road, Septic Tank, Sewer
System, Storm Water Drainage,
Water Reticulation etc.
11.00 M Completed -
2009
6 Ind. Area POLICE
LINES
Paved Road, Septic Tank, Sewer
System, Storm Water Drainage,
Water Reticulation etc.
3.00 M Completed -
2009
7 VIHIGA DIST.
HOSPITAL
Paved Road, Septic Tank, Sewer
System, Storm Water Drainage,
Water Reticulation etc.
19.00 M Completed -
2005
S. No. 1
PROJECT
KIBABII TEACHERS' TRAINING COLLEGE
Type
Paved Road, Septic Tank, Pumping Sewer System for 10 KM Length, Storm Water Drainage, Water Reticulation etc.
Cost
160.00 M
Status
Completed - 2010
S. No. 2
PROJECT
SIGOWET Sub-Dist. Hospital
Type
Paved Road, Septic Tank, Sewer System, Storm Water Drainage, Water Reticulation etc.
Cost
26.00 M
Status
Completed - 2009
S. No. 3
PROJECT
KAPKATET Sub-Dist. Hospital
Type
Paved Road, Septic Tank, Sewer System, Storm Water Drainage, Water Reticulation etc.
Cost
18.00 M
Status
Completed - 2009
S. No. 4
PROJECT
THE SALVATION ARMY Headquarters
Type
Paved Road, Septic Tank, Sewer System, Storm Water Drainage, Water Reticulation etc.
Cost
32.00 M
Status
Completed - 2008
S. No. 5
PROJECT
CENTRAL POLICE LINES
Type
Paved Road, Septic Tank, Sewer System, Storm Water Drainage, Water Reticulation etc.
Cost
11.00 M
Status
Completed - 2009
S. No. 6
PROJECT
Ind. Area POLICE LINES
Type
Paved Road, Septic Tank, Sewer System, Storm Water Drainage, Water Reticulation etc.
Cost
3.00 M
Status
Completed - 2009
S. No. 7
PROJECT
VIHIGA DIST. HOSPITAL
Type
Paved Road, Septic Tank, Sewer System, Storm Water Drainage, Water Reticulation etc.
Cost
19.00 M
Status
Completed - 2005

Complited Safaricom's

Up country transceivers stations

S.
No.
NAME CODE T.Ht B.Conc Civil
Works
Intr. Finish Status
1 MOLOONGO 382 45 SS 45 CM YES P. BLOCKS Completed
2 OSERIAN (NAIVASHA) 1326 24 SS 24 CM YES Q. CHIPS Completed
3 SAOSA TEA ESTATE
(KERICHO)
1349 45 SS 60 CM YES Q. CHIPS Completed
4 TINDERET HILL TOP
(TINDERET TEA ESTATE)
1460 45 SS 45 CM YES Q. CHIPS Completed
5 TINDERET ACCESS
ROAD (TINDERET TEA
ESTATE)
1460 2.5 KM MURRAM
ROAD
YES Q. CHIPS Completed
6 BIBIRIONI (OFF NAIROBI
NAIVASHA HIGHWAY)
0181 80 SS 172 CM YES Q. CHIPS Completed
7 KBC NAKURU (KBC
NAKURU COMPOUND)
1302-2 80 SS 172 CM YES Q. CHIPS Completed
8 EBURU HILL 1329 60 SS 142 CM YES Q. CHIPS Completed
SS - SELF SUPPORTING
S. No. 1
PROJECT
MOLOONGO
Code
382
T.Ht
45 SS
B.Conc
45 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 2
PROJECT
OSERIAN (NAIVASHA)
Code
1326
T.Ht
24 SS
B.Conc
24 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 3
PROJECT
SAOSA TEA ESTATE (KERICHO)
Code
1349
T.Ht
45 SS
B.Conc
60 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 4
PROJECT
TINDERET HILL TOP (TINDERET TEA ESTATE)
Code
1460
T.Ht
45 SS
B.Conc
45 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 5
PROJECT
TINDERET ACCESS ROAD (TINDERET TEA ESTATE)
Code
1460
T.Ht
2.5 KM
B.Conc
MURRAM ROAD
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 6
PROJECT
BIBIRIONI (OFF NAIROBI NAIVASHA HIGHWAY)
Code
0181
T.Ht
80 SS
B.Conc
172 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 7
PROJECT
KBC NAKURU (KBC NAKURU COMPOUND)
Code
1302-2
T.Ht
80 SS
B.Conc
172 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 8
PROJECT
EBURU HILL
Code
1329
T.Ht
60 SS
B.Conc
142 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
SS - SELF SUPPORTING

Safaricom's Transceiver Stations

S.
NO.
NAME CODE T.HT B.CONC CIVIL
WORKS
INTR.
FINISH
STATUS
1 MAMLAKA ROAD 102 36 SS 32 CM YES P. BLOCKS Completed
2 DAM ESTATE 308 30 M 24 CM YES P. BLOCKS Completed
3 IDEAL CORNER 340 36 SS 50 CM YES P. BLOCKS Completed
4 GITHURAI 378 30 SS 24 CM YES P. BLOCKS Completed
5 KAHAWA SUKARI 364 44 SS 50 CM YES P. BLOCKS Completed
6 HOMBE ROAD 348 36 SS 32 CM YES P. BLOCKS Completed
7 KARIOBANGI North 364 36 SS 40 CM YES P. BLOCKS Completed
8 SOUTH 'B' 342 30 M 24 CM YES P. BLOCKS Completed
9 P. SERVICE CLUB 364 30 M 24 CM YES P. BLOCKS Completed
10 NGEI ESTATE 111 30 M 24 CM YES P. BLOCKS Completed
11 ST. JAMES
HOSPITAL
381 30 M 24 CM YES P. BLOCKS Completed
12 WOOD LANDS
ESTATE
364 36 SS 32 CM YES P. BLOCKS Completed
13 LIMA ROAD 365 30 M P. CAST NO Q. CHIPS Completed
14 EMBAKASI ASP 369 36 SS 32 CM YES Q. CHIPS Completed
15 DIGO ROAD 349 30 M 24 CM YES P. BLOCKS Completed
16 K.H. RIDGE 332 NIL 0.5 CM NO Q. CHIPS Completed
S. No. 1
Project
MAMLAKA ROAD
Code
102
T.HT
36 SS
B.CONC
32 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 2
Project
DAM ESTATE
Code
308
T.HT
30 M
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 3
Project
IDEAL CORNER
Code
340
T.HT
36 SS
B.CONC
50 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 4
Project
GITHURAI
Code
378
T.HT
30 SS
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 5
Project
KAHAWA SUKARI
Code
364
T.HT
44 SS
B.CONC
50 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 6
Project
HOMBE ROAD
Code
348
T.HT
36 SS
B.CONC
32 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 7
Project
KARIOBANGI North
Code
364
T.HT
36 SS
B.CONC
40 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 8
Project
SOUTH 'B'
Code
342
T.HT
30 M
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 9
Project
P. SERVICE CLUB
Code
364
T.HT
30 M
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 10
Project
NGEI ESTATE
Code
111
T.HT
30 M
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 11
Project
ST. JAMES HOSPITAL
Code
381
T.HT
30 M
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 12
Project
WOOD LANDS ESTATE
Code
364
T.HT
36 SS
B.CONC
32 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 13
Project
LIMA ROAD
Code
365
T.HT
30 M
B.CONC
P. CAST
Civil Works
NO
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 14
Project
EMBAKASI ASP
Code
369
T.HT
36 SS
B.CONC
32 CM
Civil Works
YES
Intr. Finish
Q. CHIPS
Status
Completed
S. No. 15
Project
DIGO ROAD
Code
349
T.HT
30 M
B.CONC
24 CM
Civil Works
YES
Intr. Finish
P. BLOCKS
Status
Completed
S. No. 16
Project
K.H. RIDGE
Code
332
T.HT
NIL
B.CONC
0.5 CM
Civil Works
NO
Intr. Finish
Q. CHIPS
Status
Completed

2001

S.
No.
PROJECT COST CLIENT REFERENCE YEAR COMP
1 Completion of Residential
House at Tende Drive,
Lavington
16.00M Mr.
Dhulashia
Mr. Navanit
Patel
2000
2 Refurbishment of Kencom
House Ltd.
11.00M K.C.B. Mr. F.B.
Otieno
2002-2001
3 Erection & completion of
400M Boundary Wall at
G.F.C. Ltd., Ruaraka
4.10M G.F. Corvin
Ltd.
Mr. George
Corvin
2000/1
4 Erection & completion
of Workshop for Moeller
Controls Ltd.
6.20M Moeller
Controls Ltd.
Mr. George
Corvin
2001
S. No. 1
PROJECT
Completion of Residential House at Tende Drive, Lavington
Cost
16.00M
Client
Mr. Dhulashia
Reference
Mr. Navanit Patel
Year Comp
2000
S. No. 2
PROJECT
Refurbishment of Kencom House Ltd.
Cost
11.00M
Client
K.C.B.
Reference
Mr. F.B. Otieno
Year Comp
2002-2001
S. No. 3
PROJECT
Erection & completion of 400M Boundary Wall at G.F.C. Ltd., Ruaraka
Cost
4.10M
Client
G.F. Corvin Ltd.
Reference
Mr. George Corvin
Year Comp
2000/1
S. No. 4
PROJECT
Erection & completion of Workshop for Moeller Controls Ltd.
Cost
6.20M
Client
Moeller Controls Ltd.
Reference
Mr. George Corvin
Year Comp
2001

2000

S.No. PROJECT COST CLIENT REFERENCE YEAR COMP
5 Renovation to the Children’s Home at South ‘B’ for Goal (K) Ltd. 1.00M Goal (Kenya) Ltd. Ms. Kathleen Gately 2001
6 Refurbishment of Kencom House, Moi Avenue. 2.60M Kenya Commercial Bank Ltd. Mr. Francis Otieno 2000
7 Renovation and modifications to the Residential Flats at Quarry Road for Salvation Army 1.60M The Salvation Army Cpt: Kioko 2000
8 Creation of Showroom and erection of new offices 1.00M Tile City Ltd. Mr. Prakash 2000
S.No. 5
PROJECT
Renovation to the Children’s Home at South ‘B’ for Goal (K) Ltd.
Cost
1.00M
Client
Goal (Kenya) Ltd.
Reference
Ms. Kathleen Gately
Year Comp
2001
S.No. 6
PROJECT
Refurbishment of Kencom House, Moi Avenue.
Cost
2.60M
Client
Kenya Commercial Bank Ltd.
Reference
Mr. Francis Otieno
Year Comp
2000
S.No. 7
PROJECT
Renovation and modifications to the Residential Flats at Quarry Road for Salvation Army
Cost
1.60M
Client
The Salvation Army
Reference
Cpt: Kioko
Year Comp
2000
S.No. 8
PROJECT
Creation of Showroom and erection of new offices
Cost
1.00M
Client
Tile City Ltd.
Reference
Mr. Prakash
Year Comp
2000

1999

S.
No.
PROJECT COST CLIENT REFERENCE YEAR COMP
9 Flooring & Terrazzo works at Kampala Road 0.50M Desbro Engg.
Ltd.
Mr.
Bharadwaz
1999
10 Boundary wall, flooring generator room,
and other civil works at CPC Ltd.
2.20M G.F. Corvin
Ltd.
Mr. C.
George
1999
11 Erection & completion of R.C.C. Low
sand filter Tanks and Reservoir Tank at
Ol-Moran division for ICRC Ltd.
1.05M Red Cross/IDL Mr. Martin /
Mr. Raju
1999
12 Changing and spray painting Work
to roofing of 20,000 SMT at Kampala
Road
1.50M Ryce Motors
Ltd.
Mr. Raburu 1999
13 Renovations to Speed Bird Travel &
Safaris Ltd.
1.50M Speed Bird T&
Tours Ltd
Mrs.
Mwangi
1999
14 Civil and External Works at Bayer E.A.
Ltd. Lunga Lunga Road
1.50M Bayer E.A. Ltd. Mr. S.
Lakhani
1999
S. No. 9
PROJECT
Flooring & Terrazzo works at Kampala Road
Cost
0.50M
Client
Desbro Engg. Ltd.
Reference
Mr. Bharadwaz
Year Comp
1999
S. No. 10
PROJECT
Boundary wall, flooring generator room, and other civil works at CPC Ltd.
Cost
2.20M
Client
G.F. Corvin Ltd.
Reference
Mr. C. George
Year Comp
1999
S. No. 11
PROJECT
**Erection & completion of R.C.C. Low sand filter Tanks and Reservoir Tank at Ol-Moran division for ICRC Ltd.
Cost
1.05M
Client
Red Cross/IDL
Reference
Mr. Martin / Mr. Raju
Year Comp
1999
S. No. 12
PROJECT
Changing and spray painting Work to roofing of 20,000 SMT at Kampala Road
Cost
1.50M
Client
Ryce Motors Ltd.
Reference
Mr. Raburu
Year Comp
1999
S. No. 13
PROJECT
Renovations to Speed Bird Travel & Safaris Ltd.
Cost
1.50M
Client
Speed Bird T & Tours Ltd
Reference
Mrs. Mwangi
Year Comp
1999
S. No. 14
PROJECT
Civil and External Works at Bayer E.A. Ltd. Lunga Lunga Road
Cost
1.50M
Client
Bayer E.A. Ltd.
Reference
Mr. S. Lakhani
Year Comp
1999

1998

S.
No.
PROJECT COST CLIENT REFERENCE YEAR
COMP
15 Erection of a completely new Roof at Kampala Road 0.40M Desbro (K) Ltd. Mr. S. Sennik 1998
16 Renovation and Repairs to the Salvation Army Territorial H/Q 1.10M The Salvation Army T.C. Mr. O.
Donald
1998
17 New Machine foundations and other renovations at Lunga Lunga Road 0.80M Bayer E. A. Ltd. Mr. S.
Lakhani
1998
18 Erection of Foundations Slabs for containers at Narok farms 0.50M Bayer E. A. Ltd. Mr. S.
Lakhani
1998
19 Other Misc. Office Works for Ruambuzi Ltd & Bingo K Ltd. 1.30M Ruambuzi Ltd.
Bingo Ltd
Mr. P.V.S.
Rao & Mr.
Laurent
1998
S. No. 15
PROJECT
Erection of a completely new Roof at Kampala Road
Cost
0.40M
Client
Desbro (K) Ltd.
Reference
Mr. S. Sennik
Year Comp
1998
S. No. 16
PROJECT
Renovation and Repairs to the Salvation Army Territorial H/Q
Cost
1.10M
Client
The Salvation Army
Reference
T.C. Mr. O. Donald
Year Comp
1998
S. No. 17
PROJECT
New Machine foundations and other renovations at Lunga Lunga Road
Cost
0.80M
Client
Bayer E.A. Ltd.
Reference
Mr. S. Lakhani
Year Comp
1998
S. No. 18
PROJECT
*Erection of Foundations Slabs for containers at Narok farms
Cost
0.50M
Client
Bayer E.A. Ltd.
Reference
Mr. S. Lakhani
Year Comp
1998
S. No. 19
PROJECT
Other Misc. Office Works for Ruambuzi Ltd & Bingo K Ltd.
Cost
1.30M
Client
Ruambuzi Ltd. Bingo Ltd
Reference
Mr. P.V.S. Rao Mr. Laurent
Year Comp
1998